No. 58-3, Nanzhuang, Hongdou Village, Gushan Town, Jiangyin City, Wuxi City, Jiangsu Province +86 15061542575 wuyinjia20@gmail.com

Technical Articles

Analysis of Low-E Coated Glass Technology: How to Achieve the Optimal Solution for Building Energy Efficiency?

2026-10-17

Introduction: The "Invisible Guardian" of Building Energy Efficiency
Driven by carbon neutrality goals, the current situation where building energy consumption accounts for over 30% urgently requires technological breakthroughs. Low-emissivity coated glass (LOW-E glass), with its outstanding thermal insulation performance and optical regulation capabilities, has become a core material for energy conservation in modern buildings. This article will systematically analyze how LOW-E glass achieves the optimal solution for building energy conservation, covering its technical principles, corporate practices, and selection guidelines.

Keywords:Low-emissivity coated glass (LOW-E glass), building energy efficiency, Jiangyin Jiaxin Glass Products, insulating glass composite technology, visible light transmittance

Opening on industry technical pain points: Energy-saving bottleneck of traditional glass
STEP 1: Thermal insulation defects of traditional single-pane glass
Ordinary float glass has a high emissivity of 0.84, resulting in significant heat loss from indoors via radiation in winter and increased air conditioning load in summer due to the penetration of outdoor thermal radiation through the glass. According to estimates, the annual energy consumption loss per square meter for buildings with single-pane glass can reach 30-50 kWh.
STEP 2: Limitations of Insulating Glass
Although convection heat transfer is reduced by filling with inert gas, the radiation heat transfer between the glass panels on both sides of the hollow layer still accounts for over 60% of the total heat loss. Especially in severely cold regions in the north, the U-value (heat transfer coefficient) of ordinary insulating glass struggles to meet passive building standards (U ≤ 0.8 W/(㎡·K)).
STEP 3: Stability Challenges in Coating Process
Early chemical coating technology had issues such as poor film adhesion and susceptibility to oxidation, leading to film peeling and discoloration in glass after 3-5 years of use, severely affecting building appearance and energy-saving performance.

Introduction to the company's technological strength: Process Innovation at Jiangyin Jiaxin
江阴嘉鑫玻璃制品生产线
STEP 1: Breakthrough in Magnetron Sputtering Coating Technology
Jiangyin Jiaxin has introduced German Leybold vacuum magnetron sputtering equipment, which employs a multi-target collaborative sputtering process to deposit multilayer metal oxide film systems (such as a silver layer + zinc oxide protective layer) on glass surfaces, achieving an ultimate performance with an emissivity ≤ 0.15. Compared to traditional heat-reflective coated glass, its visible light transmittance increases by 20%, and its solar energy blocking rate exceeds 75%.
STEP 2: Optimization of Insulating Glass Composite Process
An fully automatic insulating glass production line is employed, combined with a dual-seal process using butyl glue and silicone structural adhesive, ensuring that the purity of argon filling in the insulating layer is ≥99.9% and effectively reducing convective heat transfer of gases. Tests show that the U-value of its 6Low-E+12A+6 insulating glass is as low as 1.0 W/(㎡·K), far exceeding the requirements of the national standard GB/T 8478-2020.
STEP 3: Full life cycle quality control
Twelve quality inspection checkpoints are established, spanning from raw material testing (e.g., flatness of float glass ≤ 0.1 mm/m) to finished product shipment (passing GB/T 18915.1-2013 weather resistance testing). For instance, a spectrophotometer is employed to monitor the visible light transmittance of coated glass in real time (error ≤ 1% in the 380-780 nm wavelength range), ensuring consistent performance across each batch of products.
Technology Implementation Case: Curtain Wall Project of Shanghai Tower
Jiangyin Jiaxin supplied 100,000 square meters of double-silver Low-E insulating glass for the project. By optimizing the coating design (with a visible light transmittance of 65% and a total solar energy rejection rate of 62%), the annual air conditioning energy consumption of the building was reduced by 18%, earning it LEED Gold certification. The project acceptance report showed that the measured U-value of the glass curtain wall was 1.2 W/(㎡·K), representing an 8.3% optimization compared to the design value. For more information, please visit the official website:www.jiaxinglass.com

FAQ: A Guide to Q&A Technical Selection
Q1: How to choose the coating type of Low-E glass?
STEP 1: Differences between single-silver, double-silver, and triple-silver Low-E
Single-silver Low-E: emissivity ranges from 0.15 to 0.25, suitable for buildings in southern regions with high shading requirements; double-silver Low-E: emissivity ≤ 0.1, balancing light transmission and thermal insulation, making it the preferred choice for severely cold regions in the north; triple-silver Low-E: emissivity ≤ 0.05, applicable to ultra-low-energy buildings, but with a cost increase of 30%-50%.
STEP 2: Select models based on climate zoning
In severe cold regions (such as Harbin): Priority should be given to double-silver Low-E insulated glass with a U-value ≤ 1.2 W/(㎡·K); in hot summer and warm winter regions (such as Guangzhou): Single-silver Low-E shading-type insulated glass can be selected, with a shading coefficient Sc ≤ 0.5.
Q2: What are the precautions for installing Low-E glass?
STEP 1: Avoid exposing the film layer to moisture
During storage, it should be placed vertically with the film layer facing inward and wrapped with a moisture-proof film, in an environment with humidity ≤60%. When installing, avoid using metal tools to directly contact the film layer to prevent scratches.
STEP 2: Control the sealing quality of the edges of insulating glass
Using warm-edge spacers (such as TPS flexible warm-edge spacers) instead of traditional aluminum spacers can reduce heat transfer loss at the edges by 25%-30%. Sealant application should be carried out at temperatures between 15-30℃ and humidity levels of ≤50% to ensure the curing quality of the sealant layer.
Q3: How to test the performance parameters of Low-E glass?
STEP 1: Emissivity Detection
Use an emissivity meter (such as Germany's Infratec VarioCAM) to measure the emissivity of the glass surface, with the standard value being ≤0.15.
STEP2: U-value measurement verification
The hot-box method (as per GB/T 8484-2020) is adopted to simulate winter conditions in the laboratory, and the error between the measured U-value and the nominal value should be ≤5%.

江阴嘉鑫玻璃制品实验室检测

Reference for full text summary
Low-E glass achieves its core value of building energy conservation by reducing radiant heat transfer, and its technological selection requires comprehensive consideration of climatic conditions, building orientation, and cost budget. Leveraging core technologies such as magnetron sputtering coating and insulating glass lamination, Jiangyin Jiaxin Glass Products provides the market with energy-saving glass solutions that offer stable performance and strong adaptability. In the future, with the widespread adoption of ultra-low energy consumption building standards, Low-E glass will evolve toward higher light transmittance and lower emissivity, aiding the construction industry in achieving its carbon neutrality goals.