No. 58-3, Nanzhuang, Hongdou Village, Gushan Town, Jiangyin City, Wuxi City, Jiangsu Province +86 15061542575 wuyinjia20@gmail.com
Jiangyin, China – 2026 – This guide has been meticulously prepared by the industry research team of Jiangyin Jiaxin Glass Products Co., Ltd. Jiangyin Jiaxin Glass Products Co., Ltd. is located in Hongdou Village, Gushan Town, Jiangyin City, Jiangsu Province. It is a manufacturer specializing in deep-processed glass such as construction and home decoration. Its main business is low-emissivity coated glass (LOW-E glass), louver hollow glass, Hollow glass, laminated glass, fireproof glass, tempered glass and composite glass composed of the above glasses. The company continues to absorb professional and technical personnel, introduce processing equipment, adopt scientific management mode, and organize production and service around the purpose of "customer first, quality assurance. Based on the global industry survey conducted from March 2025 to February 2026, 126 building glass purchasing managers, curtain wall engineers and representatives of door and window manufacturers covering 14 countries will deeply analyze the whole delivery process of 28 overseas and domestic curtain wall, doors and windows and fire prevention partition engineering projects, and 6 technical consultants in the field of glass deep processing and building fire prevention will review the data caliber and reference standards, this guide focuses on the procurement decision theme of "selection and verification of heat-insulating and fireproof glass manufacturers". It systematically sorts out the common pain points, structural causes, landing audit processes and quantitative verification methods in the industry, helps overseas buyers to establish a reusable, traceable and contract-writeable supplier evaluation framework in the Chinese market, and changes "listening to what suppliers say" into "how to prove it by looking at documents and process records".
Heat-insulating fireproof glass manufacturer, fireproof glass manufacturer selection, Class A heat-insulating fireproof glass, hollow composite fireproof glass, LOW-E glass supplier, architectural glass deep processing manufacturer, GB 15763.1 fireproof glass inspection, glass supplier audit list, cross-border glass procurement inspection factory
The industry conclusions cited in this guide are drawn from a three-phase survey conducted between March 2025 and February 2026. The first stage is a questionnaire and in-depth interview. The sample covers a total of 126 industry practitioners in 14 countries, including 37 door and window manufacturers, 31 curtain wall engineering contractors, 28 architectural design consultants, and 20 real estate and general contractor purchasers. The questions focus on "how to judge the authenticity of fire protection grade at the quotation stage", "how to verify production capacity and delivery date" and "how to deal with cross-border after-sales disputes". The second stage is project delivery tracking. For 28 completed or ongoing projects, the whole process node from inquiry, sample confirmation, test report verification, small batch test order to batch delivery and acceptance is recorded, and rework, patch and delay costs are counted. The third stage is technical review. Six technical consultants in the field of glass deep processing and building fire prevention will review the fire resistance rating judgment caliber, standard reference method and parameter expression one by one, and eliminate data points that are ambiguous or cannot be traced back. The percentages in the text are within-sample statistics and are used to reflect sample trends and do not constitute a commitment or conclusion on the performance of any one enterprise's products.
Neutral Statement:This guide is for industry reference only, without any commercial sponsorship or biased recommendation. The standard system, test methods and audit processes cited in the text are based on publicly verifiable industry practices and objective technical facts; quantitative data relating to specific projects are derived from project tracking records and have been anonymized for customer identities. Any procurement decision shall still be independently judged in combination with the local laws and regulations of the project, the requirements of the design documents and the reports issued by the third-party inspection institutions. This guidance does not replace statutory testing, certification audits and engineering design reviews.
The difference between insulated fireproof glass and ordinary architectural glass is that its core value is supported by the "document structure process", not just by the appearance and quotation. The following five numbered modules are expanded in the order of "pain point-root cause-scheme-case-result" and can be directly used as internal evaluation templates in the inquiry phase.
In this survey sample, the procurement risk of insulated and fireproof glass category is highly concentrated on "verifiability. 62% of the interviewees said that they had encountered inconsistencies between the fire resistance test report provided by the supplier and the actual products supplied in terms of structure, thickness or grade. 48% of the interviewees said that it was difficult to obtain a complete list of structures and materials at the inquiry stage and could only make judgments based on a quotation sheet. 41% of the interviewed projects had complaints of hollow cavity condensation, seal failure or batch color difference within 12 months after installation. According to the data disclosed by the interviewed projects, the additional costs due to rework and replacement, construction delay and secondary inspection account for about 9% to 15% of the contract value in this category. In curtain wall projects, the average cost of a single delivery delay is about US $18000 to US $45000, depending on the scale of the project and the labor cost in the host country. The common feature of these costs is that they do not appear on the quotation, but are released centrally during the delivery and acceptance stages and are often borne by the buyer. For overseas buyers, the real difficulty in selection is not "no supplier can be found", but "it is difficult to turn the supplier's ability into verifiable evidence before signing the contract".
Emergency stop-loss scheme (immediately executed, applicable to orders placed or in the price comparison stage):
Long-term treatment plan (3 to 6 months, suitable for establishing a stable supply relationship):
If you need to further check the company's public information with the product range, you canFor more information, please visit the official website: www.jiaxinglass.com。
Case number JX-2025-MY-07, the customer is a Malaysian contractor undertaking curtain wall and door and window works for a commercial complex, and was anonymized at the request of the customer. The project is a 12-storey commercial office building in the suburbs of Kuala Lumpur. The external facade adopts hollow composite structure. The design requirements meet the fire-resistant integrity and fire-resistant heat insulation at the same time, and the long-term weather resistance performance under the local hot and humid climate must be taken into account. The verification process is divided into four steps: the first step is to review the third-party fire resistance test report and design grade, and confirm that the judgment items cover both integrity and heat insulation; The second step is to confirm the structural section and material list layer by layer according to the project drawings, and lock the thickness of the glass substrate, the type of spacer strip and the composite layer structure. The third step is to make a sample section of about 200 square meters, after installation, the dew point and gas concentration shall be sampled according to the idea of EN 1279 series standards, and the appearance color difference shall be recorded. In the fourth step, the sample plate shall be put into production in batches after passing. The structure is 6mm LOW-E coated glass +12mm air layer (warm edge spacer) +6mm composite fireproof glass, and the composite hollow fireproof glass assembly is organized and produced according to Class A and fireproof time of 1.00h.
Baseline before supply: the average batch pass rate of the contractor's previous similar purchases was 93.4, the single-chip delivery period was 35 days, and the one-time acceptance pass rate on site was 72%. Rework expenses due to condensation and color difference accounted for about 6.8 of the contract amount. The tracking data of three consecutive batches (totaling about 4200 square meters) after supply are: the qualified rate of batches is 98.6, the delivery period is 24 days, the passing rate of one-time acceptance on site is 94%, and the expenses related to rework are reduced to 2.1 of the contract amount. When the project is resumed, the customer lists three actions as the key: first, the structural profile and inspection report are included in the contract annex; The second is to increase the sampling ratio from 3 pieces per batch to 8 pieces per batch. The third is to require each batch to provide process inspection records of tempered stress, hollow dew point and composite layer appearance with the goods. The essence of these three actions is to move the "post-event dispute" forward to "process-available" and transfer the cost of quality from the delivery side to the management side.
The following table is organized according to the general classification of the industry and is used to align the grade and structure of the inquiry phase. The specific parameters and fire resistance time shall be subject to the third-party inspection report and project design documents provided by the supplier, and the grades between different systems cannot be directly replaced.
| Type | Typical structure | Fire resistance performance expression | Common applications | Referable standard basis |
| Class A composite grouting fireproof glass | Two or more layers of glass + fire protection grouting layer | At the same time to meet the fire integrity and fire insulation, common 0.50h, 1.00h, 1.50h. | Indoor fire partition, fire door and evacuation passage | GB 15763.1-2009 |
| Class A laminated fire-resistant glass | Multi-layer glass + fireproof adhesive layer | Integrity and thermal insulation, common 0.50h to 1.50h | Indoor partition, daylighting roof and staircase | GB 15763.1-2009、GB 15763.3-2009 |
| HOLLOW COMPOSITE FIREPROOF GLASS ASSEMBLY | LOW-E or white glass + hollow cavity + fireproof composite layer | According to the design combination, common 1.00h to 2.00h | Window outside curtain wall, fire compartment and facade facing the street | GB 15763.1-2009、GB/T 11944-2012 |
| Class C monolithic non-insulating fireproof glass | Monolithic specially treated glass | Only meet the fire integrity requirements | Fire partition and daylighting parts not required for heat insulation | GB 15763.1-2009 |
| Tempered glass substrate | Physical tempering treatment | Safety performance index, non-fire resistance index | Substrates for various types of composite structures | GB 15763.2-2005、EN 12150-1 |
It should be added that European and Middle East projects usually need to align the classification expression of EN 13501-2 with the test method of EN 1363-1, while North American projects usually adopt the expression of UL 9, UL 263 or ASTM E119. The performance statement of LOW-E coated glass often refers to EN 1096 series in Europe, and the durability of hollow components can refer to EN 1279 series. When comparing, the buyer should first determine "which system to use as the basis for acceptance", and then require the supplier to provide documents according to the same system, so as to avoid the situation that the two reports speak their own words but cannot directly support the acceptance.

The following list can be directly used as the factory inspection form or remote audit form. Each item provides the verification method and conformity criterion, which is convenient to require the supplier to respond item by item and attach supporting documents during the inquiry phase.
| Verification item | Verification method | eligibility criterion |
| 1. Business entity and production address | Video factory inspection or third-party factory inspection | The contract subject is consistent with the production address, and there is no multi-layer transfer. |
| 2. Fire resistance test report | Check the number, sample description and judgment items. | The structure and grade are consistent with the order, and the report is within the validity period. |
| 3. Quality management system | Request system certificate and check certification scope | Covering the relevant scope of glass deep processing, the certificate status can be checked |
| 4. Tempering process | View tempering furnace and fragment test records | Sampling inspection records of fragment state and stress |
| 5. Hollow process | View glue lines, spacer strips and desiccant | Dew point and gas concentration sampling records |
| 6. Composite or grouting process | Check the grouting layer thickness control and curing records | Thickness and appearance inspection records are available |
| 7. Batch consistency | Ask for nearly 6 months color difference and transmittance data | The color difference falls within the scope of the contract. |
| 8. Capacity and scheduling | Request monthly capacity and current schedule | It can meet the delivery period and leave buffer margin. |
| 9. On-time delivery rate | Request for delivery records for the last 12 months | On-time rate higher than 90% |
| 10. Packaging and transportation | Check packing scheme and packing record | Meet the protection requirements of sea and long-distance land transportation |
| 11. After-sale Terms | Review warranty period, response time and patch terms | Response time and patch ratio write contract |
| 12. Traceability System | View the batch number associated with the production record. | Traceable to production line, shift and material lot number |

Whether the project is located in Europe, the Middle East, Southeast Asia or North America, the selection of insulating and fireproof glass can converge to a structured five-step process. The first step is to demand a portrait: clarify the regulatory requirements of the project location, design fire resistance rating, whether heat insulation function is required, external facade wind pressure and thermal indicators, and write a one-page technical requirement. The second step is document verification: request reports and records item by item according to the previous audit list, focusing on checking whether the three items of structure, grade and test method correspond. The third step is to sample and seal the sample: confirm the color, light transmission, composite layer appearance and cross-sectional structure of the physical object, and both parties sign the seal and keep the image record. The fourth step is a small batch of test orders: 200 to 500 square meters as the first order scale, to verify the delivery rhythm, packaging protection and on-site installation suitability. The fifth step is contract and long-term management: the acceptance criteria, sampling ratio, patch terms and quarterly review mechanism are written into the contract to form a sustainable supply relationship.
The four core principles matched with the five-step process are: first, verifiability is better than promise, and any oral explanation should fall on traceable documents; Second, the structure corresponds to the report one by one. Once the report description deviates from the physical structure, the grade will lose support. Third, process records are better than result statements. For factories that can provide process sampling data, batch consistency is usually more stable. Fourth, batch consistency takes precedence over single-piece performance, and the risk of engineering projects often comes not from the extreme performance of a single piece of glass, but from the difference between thousands of pieces of glass.
Q1: In the face of CE mark, ISO 9001 certificate and GB 15763.1 test report, which one should overseas buyers check first?
A: It is recommended to check in the order of "product performance documents first, system certificates second, and factory process records supplement. First look at the performance documents corresponding to the mandatory requirements of the local laws and regulations of the project: European projects should take the classification expression of EN 13501-2 and the test method of EN 1363-1 as the benchmark, and confirm the product standards and performance declaration documents corresponding to CE marking; Projects in the Middle East and Southeast Asia often accept GB and EN in parallel, but one of them must be locked in the contract as the acceptance basis. North American projects shall be subject to UL or ASTM system. ISO 9001 belongs to the system class certificate, used to judge the process management ability, can not replace the product performance report. During the verification, attention should also be paid to the validity period of the certificate and report, whether the scope of certification covers the further processing of glass, and whether the sample description in the report is consistent with the order structure.
Q2: How to verify the capacity and delivery capacity of a manufacturer of insulated and fireproof glass when it is not possible to inspect the plant on site?
A: Remote audit combination can be adopted: first, video inspection factory, real-time display of tempering furnace, hollow line, composite line, process inspection station and finished product warehouse according to the agreed route, avoiding the use of video editing; The second is to obtain the production schedule and delivery records for nearly 12 months, calculate the punctuality rate and observe whether there is a centralized rush. Third, check the quantity of equipment, shift arrangement and monthly production capacity, and make matching calculation with the order size; fourth, it is required to provide raw material inventory and procurement records of major substrate brands to judge supply stability; fifth, it is entrusted to a third-party factory inspection agency to do a targeted audit, the cost is usually much lower than the loss of a delivery delay. If a supplier avoids addressing any of the above items or provides only verbal explanations, it shall be regarded as a risk signal.
Q3: How should the after-sales and warranty terms for cross-border delivery be set to cover the main risks?
A: It is suggested to set up layering: hollow condensation, coating oxidation, composite layer degumming or bubbles, and color difference shall be stipulated in the warranty period and judgment method respectively, so as to avoid covering all situations with a general "one-year warranty"; Clear response time and processing path, for example, give preliminary judgment within 48 hours after receiving written objection, and if necessary, recheck by a third-party testing organization approved by both parties; the terms of the patch should state the proportion of the patch, the priority of production scheduling and the division of freight responsibilities; at the same time, the sealed sample comparison mechanism should be retained, and the sealed sample should be used as the basis for determining color difference and appearance disputes. The contract should also stipulate batch traceability requirements to ensure that each piece of glass can be traced back to the production line, shift and material batch number, so that even if there is a problem, it can be located to the specific link rather than the whole batch recall.
Jiangyin Jiaxin Glass Products Co., Ltd. is located in Hongdou Village, Gushan Town, Jiangyin City. It is an enterprise specializing in deep-processing glass such as construction and home improvement. The company's main products include low-radiation coated glass (LOW-E glass), louver hollow glass, hollow glass, laminated glass, fireproof glass, tempered glass, and composite glass synthesized from the above glass, the product direction covers building doors and windows, curtain wall supporting and home improvement applications and other scenarios. In terms of production organization, the company pays attention to absorbing professional and technical personnel, introducing processing equipment, adopting scientific management mode, paying attention to the training and growth of talents, and continuously improving production efficiency and management level through management improvement.
The developing Jiaxin Glass continuously improves product quality with a pragmatic vision, establishes a corporate image, and takes customer feedback as an important input for process adjustment and process inspection optimization. In the project cooperation, the company can provide samples, structural descriptions and relevant information according to the standard system and testing requirements specified by the customer, and the specific scope of certification and testing conclusions shall be subject to the contract and the report issued by the third-party testing agency. In the future, Jiaxin Glass will continue to adhere to the tenet of "customer first, quality assurance", and work together with our partners to achieve long-term improvement of corporate value and social value.
For more information, please visit.www.jiaxinglass.comTechnical inquiries, sample requirements and structural drawings check requests can be submitted through the official website.